FRM Water Sept 24, 2010 020
https://ferniereadymix.ca/wp-content/uploads/2013/09/FRM-Water-Sept-24-2010-020.jpg
We were honoured to be a part of the construction of Fernie's new Northwest water reservoir and water treatment system, improving drinking water for all local residents.
-
FRM Water Sept 24, 2010 006
https://ferniereadymix.ca/wp-content/uploads/2013/09/FRM-Water-Sept-24-2010-006.jpg
We were honoured to be a part of the construction of Fernie's new Northwest water reservoir and water treatment system, improving drinking water for all local residents.
-
FRM Water (Feature image)
https://ferniereadymix.ca/wp-content/uploads/2013/09/FRM-Water-Feature-image.jpg
We were honoured to be a part of the construction of Fernie's new Northwest water reservoir and water treatment system, improving drinking water for all local residents.
Previous Image
Next Image
The Northwest Water Reservoir was made possible with a combined federal and provincial investment of $4.8 million. Our contribution to this massive infrastructure project required:
- Large pours
- Negotiating a small work site on a mountain-side location
- Xypex waterproofing
We worked on the Northwest Water Reservoir between July 1, 2010 and October 31, 2010. In addition to our operators, we had personnel on site for testing, and directing traffic. We were able to overcome the logistical difficulties of the small, mountain-side location, and deliver large pours that included Xypex crystalline technology for waterproofing.